초록 |
In this study, we analyzed t he design condition for appropriate design factor at geothermal system design documents. It is intended to provide the proper information of geothermal system design condition when construct new building, designer can use design conditions more efficiently. Therefore, it is possible to plan for domestic geothermal system, through utilization at design element, to provide as a good information that can predict the approximate underground condition. Thus, provided the basic design conditions that can predict the capacity of the geothermal system. It will be the first step to solve the problem. |