시설장비 설명 |
1. This system enables various measurements of safety requirements such as Impulse, Withstand Voltage and Resistance Insulation, etc 2. The simulator automatically stops generating the pulses if the peak current measured exceeds the threshold limit which can be freely set as the breakdown criteria. 3. This simulator provide a combination waveform generator with a 2 ohm output impedance as called for by the IEC61000-4-5, up to 15KV and 6KV respectively. 4. Fully programmable High power design 5. A rise time and fall time control function |